Phase 2 Ground Investigation in Chesterfield
Following on from our machine excavated trials holes at this site in Chesterfield we were back on site this week with a Dynamic Sampling rig. A total of three boreholes were sunk across the site and groundwater and ground gas monitoring installations fitted. Samples were collected for geotechnical and contamination testing. The site lies over […]